Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 32 results ...

Aboukhadra, W (2021) Learning organisation, affective commitment and cultural intelligence: the case of expatriates in the Gulf Co-operation Council countries, Unpublished PhD Thesis, , Nottingham Trent University.

Adnan, H B (2004) Joint venture projects in Malaysian Construction Industry Factors Critical to success, Unpublished PhD Thesis, School of Property and Construction, Nottingham Trent University.

Agyekum-Mensah, G (2013) The development of an innovative sustainable total planning and control system for construction projects, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

  • Type: Thesis
  • Keywords: case study; communication; control system; ethics; government; interview; project management; project planning; qualitative research; scheduling; sustainable construction; UK; workflow
  • ISBN/ISSN:
  • URL: http://irep.ntu.ac.uk/id/eprint/29/
  • Abstract:
    The management of construction projects has been heavily criticised by government institutions, academics and practitioners for delays, cost overruns and suboptimum performance. Numerous studies have identified project planning as the main problem with both the management methodology and conventional project planning techniques deemed insufficient. It has been established that only fifty per cent of the planned work is completed as scheduled. This is consistent with the findings of this study, which again confirms the insufficiency of the techniques available to the general practitioner. This research explores operational problems associated with project planning and control, and develops an innovative and holistic planning and control system to deliver sustainable construction projects. A qualitative strategy was adopted for this study utilising interviews and multiple case study methods, which are complementary approaches. In total, four case studies were selected from the predominant UK construction industry and 81 interviews were conducted for this study. Given the criticisms of qualitative research as methodologically weak, this study develops a research process that addresses the specific objectives of the study. This research contributes to Project Management (PM) knowledge by developing and implementing an innovative Total Planning and Control (TPC) system to enhance the current practice and to deliver sustainable projects. The TPC system is a holistic, simple, effective and efficient approach for project planning and control in the ‘real world’ construction industry. It was developed through a practice informed theory approach, which make it more applicable to actual construction projects. The implication of the TPC system is to overcome the limitations of planning and managing construction projects, which also improves communication, workflow and sets foundation for related functions such as, logistic, cost, risk, collaborative and early warning planning. The TPC system comprises of the development of a 4Es (Economic, Effectiveness, Efficiency, and Ethics) management and performance model, project and PM constraints, construction PM managerial process, as well as a sustainable model, 4Es and 4Poles (Technology, Economy, Society and Environment). This study is concerned with the enhancement of construction PM practice. It also enables a deeper understanding of project planning and control in contrast to the conventional planning system which focuses mainly on scheduling.

Ahmed Namadi, S i (2019) A framework for collaborative costing in the UK construction industry, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Alharbi, F (2020) Critical delay factors in housing construction projects in Saudi Arabia: Assessment and solutions, Unpublished PhD Thesis, , Nottingham Trent University.

Asnaashari, E (2011) A holistic conceptual model for managing construction logistics in building projects: the case of Iran, Unpublished PhD Thesis, School of Science and Technology, Nottingham Trent University.

Boyal-Seth, H (2011) Assessing the business case for supplier diversity in the construction housing sector, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Coupar, G (2009) Modern approaches to repairs and maintenance procurement within the social housing sector, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Daniel, E I (2017) Exploratory study into the use of Last Planner® System and collaborative planning for construction process improvement, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Dowd, V G (1999) The pervading role of risk allocation as the link mechanism between factors of influence and construction procurement practices adopted in the UK construction industry over the period 1965-1995, Unpublished PhD Thesis, , Nottingham Trent University.

Dupin, P (2021) Using pull and flow systems to improve production stability in real estate development projects, Unpublished PhD Thesis, , Nottingham Trent University.

Grada, M (2007) The impact of economic value added measure in assessing the business performance of UK construction companies, Unpublished PhD Thesis, , Nottingham Trent University.

Hackett, V (2017) The impact of a collaborative planning approach on engineering construction performance, Unpublished PhD Thesis, , Nottingham Trent University.

Hamza, A (2002) Partnering in the construction industry: an empirical investigation into the critical success factors, Unpublished PhD Thesis, School of Property and Construction, Nottingham Trent University.

Hurst, A G (2009) Management education, training and development of construction managers: will they ever learn?, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Idan, C K (2003) Quality function deployment (QFD) in the UK construction industry, Unpublished PhD Thesis, , Nottingham Trent University.

Jaafar, T (1992) A unified methodology for project planning risk, Unpublished PhD Thesis, , Nottingham Trent University.

Jackson, F (2006) Biodegradable hydraulic fluids: Reducing oil-related pollution in the construction industry, Unpublished PhD Thesis, , Nottingham Trent University.

Keats, R J (2014) An exploration of how professional associations advance innovation and promote innovation pedagogy, Unpublished PhD Thesis, , Nottingham Trent University.

Khadour, L (2010) Total quality environmental management framework towards sustainability (UK novated D&B principal contractors), Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Khalid, U (2022) Investigation into the development of a human reliability analysis framework for the safety management of construction projects, Unpublished PhD Thesis, , Nottingham Trent University.

Kings, S (2002) Pricing documentation for contractors' estimators: Establishing a more effective approach, Unpublished PhD Thesis, , Nottingham Trent University.

McLean, M (2014) A longitudinal analysis of a partial mediation model of employee engagement in a knowledge-intensive firm, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Musa, M M (2019) A framework for implementing target value delivery to enhance value creation in the construction industry, Unpublished PhD Thesis, , Nottingham Trent University.

Owen, K J (2002) Success factors in the procurement of privately financed tolled transportation infrastructure projects in the UK, Unpublished PhD Thesis, School of Property and Construction, Nottingham Trent University.

Payne, B (1998) Project risk analysis, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Pritchard, C (2005) Skin cancer prevention in the house building industry, Unpublished PhD Thesis, , Nottingham Trent University.

Rashid, K B A (1998) The processes of construction procurement in Malaysia: Identification of constraints and development of proposed strategies in the context of 'vision 2020', Unpublished PhD Thesis, , Nottingham Trent University.

Sarhan, S (2018) Institutional waste within the UK construction industry: an exploratory study, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Sharif, A (1996) A functional analysis of building procurement systems and strategies in an international context, Unpublished PhD Thesis, , Nottingham Trent University.

Taylor, M S (2021) Strategic management accounting practices in medium sized UK construction companies: a mixed-methods approach, Unpublished PhD Thesis, , Nottingham Trent University.

Ward, A D (2016) Development of a contextualised understanding of the diffusion of innovation among quantity surveyors in the UK construction industry, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.